Data centers builtfrom a drawing, not a guess.
Rack layout, power budget, cooling, structured cabling and equipment installation — designed in an HLD/LLD, built under change control and handed over with as-built drawings and a commissioning report.
What we do
A data center that is drawn before it is built costs less to run for ten years. We start with a rack elevation, a power and cooling budget per rack, a cable schedule and an IP plan — then procure, install and commission against that drawing set.
We have designed and operated HPE Gen10 estates on Brocade FC fabrics with 3PAR and Alletra storage, and we bring the same discipline to a four-rack server room or a forty-rack hall: labelled cabling, dual-fed power, documented airflow, and a commissioning test that proves the design.
- Site survey & designRack layout, power and cooling budget, structured cabling plan, IP/VLAN plan
- Procurement supportVendor-neutral bill of materials, quote comparison, delivery scheduling
- InstallationRacks, PDUs, patch panels, servers, storage, switches, FC fabric
- CommissioningPower-on tests, redundancy failover, thermal check, labelling audit
- Handover packAs-built drawings, cable schedule, asset register, runbooks
The engagement, step by step
Audit
We inventory what you run — hardware, hypervisors, storage, backups, network — and document the risks.
Blueprint
HLD/LLD with architecture, bill of materials, migration plan, budget and timeline, within 48 hours of the audit.
Build
Change-controlled implementation with MOPs, rehearsed cutovers and as-built drawings.
Operate
Monitoring, AMC or managed operations with monthly reports and quarterly reviews.
What we put in writing
Written into the blueprint before work starts. If a number is not here, ask for it — we put it in writing.
| Deliverable | HLD, LLD, rack elevations, cable schedule, as-built drawings |
|---|---|
| Redundancy | Dual power feeds and dual network paths verified under test |
| Timeline | Typical 4-rack room: 3–5 weeks from design sign-off |
| Warranty | Installation workmanship covered for 12 months |
Questions we get asked
Do you handle the civil and electrical work?
Can you build inside a colocation facility?
What size projects do you take?
Send us your rack list or hypervisor inventory. The blueprint comes back in 48 hours.
Free audit call, written HLD, fixed-price proposal.