Change the hypervisor.Keep the uptime.
We move workloads from physical servers, VMware, OLVM/oVirt and Hyper-V to Proxmox, OpenStack or KVM — disks pre-replicated, cutovers rehearsed, each VM down for minutes, not hours.
What we do
We have moved production VMs from OLVM and VMware to Proxmox for enterprise production platforms — including OpenShift environments, Active Directory controllers and SFTP services — with minutes of downtime per workload. The method is the same at every scale: replicate, validate, rehearse, cut over, keep the source as the rollback.
Licensing changes make this urgent for many VMware customers. We size the target cluster, migrate in waves ordered by dependency, and hand over a documented, monitored environment with backups verified.
- AssessmentInventory, dependencies, sizing of the target cluster
- Target buildProxmox / OpenStack / KVM cluster, storage, HA, networking
- Replication & validationDisk sync, driver and boot validation on the target
- Wave cutoversOrdered by dependency, change-controlled, rollback ready
- HandoverBackups (PBS), monitoring, runbooks, decommission plan
The engagement, step by step
Audit
We inventory what you run — hardware, hypervisors, storage, backups, network — and document the risks.
Blueprint
HLD/LLD with architecture, bill of materials, migration plan, budget and timeline, within 48 hours of the audit.
Build
Change-controlled implementation with MOPs, rehearsed cutovers and as-built drawings.
Operate
Monitoring, AMC or managed operations with monthly reports and quarterly reviews.
What we put in writing
Written into the blueprint before work starts. If a number is not here, ask for it — we put it in writing.
| Downtime | Minutes per VM in agreed windows |
|---|---|
| Rollback | Source kept intact until sign-off |
| Scale | Single server to hundreds of VMs, migrated in waves |
| Documentation | Inventory, cutover log, as-built cluster design |
Questions we get asked
Why Proxmox instead of staying on VMware?
Can you migrate Windows servers and domain controllers?
Do you also migrate physical servers?
Send us your rack list or hypervisor inventory. The blueprint comes back in 48 hours.
Free audit call, written HLD, fixed-price proposal.