From the rackto the private cloud.
Design, build, migrate and operate. We produce the HLD/LLD, cable the racks, deploy the hypervisors, move the workloads and stay on as the operations team — with the drawings, runbooks and DR drills to prove it.
Eleven services. One drawing set.
From a single AMC contract to a full data center build and migration. Each one ships with as-built documentation your next engineer can follow.
Data Center Implementation
Design, build and commissioning — racks, power, cooling, cabling
HLD, LLD, rack elevations, cable schedule, as-built drawingsData Center AMC & Operations
SLA-backed annual maintenance for servers, storage, network
30 min remote · 4 h on-site (NCR) · next business day elsewhereColocation & Hosting
Colocation across multiple facilities, managed hosting on top
Tier III providers in Delhi NCR, Mumbai, Bengaluru, ChennaiData Center Relocation
Lift-and-shift across India with planned cutover windows
Zero — verified restore before any equipment is powered downP2V & V2V Migrations
VMware, OLVM/oVirt and Hyper-V to Proxmox or OpenStack
Minutes per VM in agreed windowsPrivate Cloud & IaaS
Your own cloud, sized for your workloads, fixed monthly cost
99.9% platform availability under managed operationsOpenStack Services
Deployment, upgrades and day-2 operations of OpenStack clouds
HA across three nodes minimumVirtualization
Proxmox, VMware, KVM, Hyper-V and oVirt design and lifecycle
HA failover tested at handover and quarterlyBackup & Disaster Recovery
3-2-1 design, immutable copies, DR drills that actually run
Defined per workload, written into the designSAN / NAS Management & Migration
HPE 3PAR, Alletra, MSA; Brocade fabrics; online data mobility
Online for most workloads; planned minutes for the restSystem Administration
Linux and Windows estates patched, monitored, documented
Monthly, with critical patches within 48 hoursData Center Migration & Lift-and-Shift
Discovery → waves → rehearsed cutover → rollback kept open
Agreed per wave in writing; typical 2–6 hours for physical, minutes for replicatedApplication & Database Migration
Platform, database and framework migrations with parallel-run validation
Row-level validation report before cutoverLicence Optimisation & Open-Source Replacement
Audit → replacement map → 3-year savings → execute with support
Modelled over 3 years, agreed before any swapCapacity Planning & Infrastructure Enhancement
Utilisation → model → bottlenecks → phased BoM
We do not resell hardware; specs favour youPublic Cloud Setup — AWS, Azure, GCP, OCI
Landing zone · network · workloads · guardrails · hybrid link
MFA, least privilege, encryption, logging on from day oneEngineering, not reselling
We are not a hardware reseller with a services desk attached. The team that quotes your data center is the team that has built and migrated them — HPE Gen10 estates on Brocade fabrics and 3PAR/Alletra storage, Proxmox and OpenStack clusters, OLVM and VMware environments moved with minutes of downtime.
Every engagement starts with a written high-level design and ends with runbooks, a tested backup and a DR drill that actually ran. If you want to leave the hyperscaler bill behind, we size a private cloud for your real workloads and give you a fixed monthly number.
- Vendor-neutralHPE, Dell, Cisco, Brocade, Proxmox, VMware, OpenStack — we recommend what fits, not what pays commission.
- Documentation firstHLD/LLD, rack elevations, cable schedules, IP plans and MOPs before cutover.
- Downtime in minutesP2V/V2V with pre-synced disks and rehearsed cutovers; change-controlled windows.
- DR that is tested3-2-1 with immutable copies and quarterly restore drills, with the report to prove it.
- India-wide on-siteNoida, Delhi NCR, Chandigarh, Himachal and partner engineers across India.
Questions we get asked
Do you supply hardware or only services?
Can you migrate us off VMware without a long outage?
What does a private cloud cost compared with public cloud?
Where are your engineers based?
Send us your current rack list or cloud bill. We return a blueprint, a budget and a timeline.
The first conversation and audit are free. The blueprint is written within 48 hours.