Hypervisors designedfor uptime, not demos.
Cluster design, HA, storage and network integration, hardening, patching and performance tuning for Proxmox VE, VMware vSphere, KVM, Hyper-V and oVirt/OLVM — plus migration between them when licensing or strategy changes.
What we do
We run Proxmox, VMware, OLVM and KVM in production every day, on FC SANs and on Ceph, for workloads that cannot go down. That is the experience behind every cluster we design: correct fencing and quorum, storage multipathing, network bonding, backup integration and a patch cadence that is actually followed.
We are vendor-neutral. If VMware still fits, we harden and operate it. If licensing has made it untenable, we move you to Proxmox or KVM with minimal downtime.
- Cluster design & buildNodes, quorum, HA, fencing, storage and network integration
- HardeningAccess control, updates, secure boot, backup of configuration
- Performance tuningCPU/NUMA, storage queues, network offloads, VM right-sizing
- LifecyclePatch windows, firmware baselines, capacity planning
- Platform migrationVMware/OLVM/Hyper-V to Proxmox, KVM or OpenStack
The engagement, step by step
Audit
We inventory what you run — hardware, hypervisors, storage, backups, network — and document the risks.
Blueprint
HLD/LLD with architecture, bill of materials, migration plan, budget and timeline, within 48 hours of the audit.
Build
Change-controlled implementation with MOPs, rehearsed cutovers and as-built drawings.
Operate
Monitoring, AMC or managed operations with monthly reports and quarterly reviews.
What we put in writing
Written into the blueprint before work starts. If a number is not here, ask for it — we put it in writing.
| Availability | HA failover tested at handover and quarterly |
|---|---|
| Patching | Monthly cadence, change-controlled |
| Response | 30 min remote under managed operations |
| Documentation | LLD, network and storage maps, runbooks |
Questions we get asked
Do you support VMware after the licensing changes?
Can Proxmox run on our existing SAN?
What about Hyper-V?
Send us your rack list or hypervisor inventory. The blueprint comes back in 48 hours.
Free audit call, written HLD, fixed-price proposal.