Dependency mapping, a written move plan, verified backups, insured transport, re-installation and a rehearsed cutover — so the only thing your users notice is the maintenance window you announced.
What we do
A relocation is a hundred small changes that must happen in the right order. We map every dependency first — applications, storage paths, IPs, DNS, certificates, licences tied to hardware — and write the move as a method of procedure with a rollback at every step.
Backups are taken and restore-tested before anything is unplugged. Transport is insured and tracked. Re-installation follows the new rack elevations, and cutover is rehearsed with your application owners before the real window.
- Discovery & dependency mapApplications, storage, network, DNS, certificates, licences
- Move plan (MOP)Sequence, owners, timings, rollback points, communication plan
- Backup & restore testFull backups verified by restore before the move
- Transport & re-installationPacking, insured transport, racking, cabling, power-on
- Cutover & verificationApplication tests, DNS, monitoring, sign-off
The engagement, step by step
Audit
We inventory what you run — hardware, hypervisors, storage, backups, network — and document the risks.
Blueprint
HLD/LLD with architecture, bill of materials, migration plan, budget and timeline, within 48 hours of the audit.
Build
Change-controlled implementation with MOPs, rehearsed cutovers and as-built drawings.
Operate
Monitoring, AMC or managed operations with monthly reports and quarterly reviews.
What we put in writing
Written into the blueprint before work starts. If a number is not here, ask for it — we put it in writing.
| Data loss | Zero — verified restore before any equipment is powered down |
|---|---|
| Downtime | Agreed per application; typically one planned weekend window |
| Rollback | Defined at every step of the MOP |
| Coverage | Anywhere in India; cross-border on request |
Questions we get asked
Can you move us into a colocation facility or a new office?
What if some servers cannot be powered down?
How long does a relocation take?
Send us your rack list or hypervisor inventory. The blueprint comes back in 48 hours.
Free audit call, written HLD, fixed-price proposal.