Move the data center.Keep the business running.
Rack-to-rack relocation, DC-to-DC consolidation, or DC-to-cloud: we map every dependency, rehearse every cutover, and move in waves with a tested rollback — so the migration is an event for us, not for your users.
What we do
Most migrations fail on the things nobody wrote down: the hard-coded IP in a batch job, the licence tied to a MAC, the firewall rule only one person knew. Our discovery phase exists to find exactly those before the trucks or the replication jobs start.
We move in waves — dev/test first, then internal, then customer-facing — each with a change ticket, a rehearsal, a cutover checklist and a rollback window. The last wave is the easiest because the first three taught us everything.
- Discovery & dependency mapApplication-to-server-to-storage-to-network map, licences, external integrations
- Target designRack layout or cloud landing zone, IP plan, DNS/firewall changes, bandwidth
- Wave planningRisk-ranked groups, blackout dates, stakeholder sign-off
- ExecutionPhysical lift-and-shift with insured logistics, or replication (Veeam, PBS, rsync, DB log shipping)
- Cutover & hypercareRehearsed runbook, verification tests, 2-week hypercare, as-built documentation
The engagement, step by step
Audit
We inventory what you run — hardware, hypervisors, storage, backups, network — and document the risks.
Blueprint
HLD/LLD with architecture, bill of materials, migration plan, budget and timeline, within 48 hours of the audit.
Build
Change-controlled implementation with MOPs, rehearsed cutovers and as-built drawings.
Operate
Monitoring, AMC or managed operations with monthly reports and quarterly reviews.
What we put in writing
Written into the blueprint before work starts. If a number is not here, ask for it — we put it in writing.
| Downtime | Agreed per wave in writing; typical 2–6 hours for physical, minutes for replicated |
|---|---|
| Rollback | Source kept restorable for 7 days after each wave |
| Insurance | Transit insurance on every physical move |
| Documentation | As-built HLD, IP plan, runbooks delivered before sign-off |
Questions we get asked
Physical move or replicate?
Can you migrate into a colocation facility?
How long does a 20-rack migration take?
Send us your rack list or hypervisor inventory. The blueprint comes back in 48 hours.
Free audit call, written HLD, fixed-price proposal.